Skip to main content
  • ENG
  • LAT
  • RUS
  • SPA
  • Home
  • Services
    • Developed Models
    • Coordinated Design
    • Managed BIM
  • About
    • Team
    • Events
  • Projects
  • Blog
  • Contact Us
  • For Developers

Wembley Park by QuintainAIM development

March 9, 2020 at 8:09 pm, No comments

Last year we did several projects in the UK. One of the highlights was creating an MEP Asset information model (AIM) for one of the buildings in Wembley Park developed by Quintain.



The task consisted of several parts:

  • using as-built drawings, laser surveys and BIM’s to create MEP AIM’s;
  • adding fields for COBie parameter input for maintainable assets.

Custom Dynamo scripts were developed to support this process.


Special thanks to our client FL Innovations and to our partner AIMIS Solutions ltd. to making this project happen!

No comments

Leave a reply







Recent Posts

  • BIM Coordinator - Expensive?
    26. Jun 2025
  • Drawings from 3D or 3D from Drawings?
    18. Jun 2025
  • Nomination "Best BIM Project"
    1. Sep 2022
  • Heritage BIM benefits in Case Study Riga castle
    6. Sep 2021
  • ITED is presenting at Europe's leading 16th Pipeline Technology Conference
    16. Mar 2021
  • Designing a residential building in BIM environment within 45 days - Case Study
    16. Feb 2021
  • Zigurat Global Institute of Technology partners with ITED
    24. Nov 2020
ITED - Innovative Technologies in Engineering & Design
Copyright © 2025 SIA ITED. All rights reserved.